Category Archives: Off Season

Cedar Point to Open DQ Grill & Chill® Restaurant in Sandusky

Cedar Point Press Release

SANDUSKY, Ohio – Guests visiting Cedar Point will have even more taste-tempting options to choose from this summer. And you won’t even have to be in the park.

In May, the Sandusky, Ohio, amusement park/resort will open a DQ Grill & Chill restaurant near the entrance to the Cedar Point Causeway in Sandusky.

The seasonal franchise will replace the East of Chicago pizza chain that has been in operation at the corner of Fifth Street and Cedar Point Drive since 2001.

The new DQ Grill & Chill location will offer an expanded menu that will not only include burgers, fries, extensive kids’ menu and the Dairy Queen system’s extremely popular Blizzard® Flavor Treats and a variety of ice cream desserts, but also hot dogs, wraps and grilled sandwiches. It will also be open in the morning and will serve breakfast favorites such as egg sandwiches, hash browns, pancakes, coffee and juice to guests who want to get an early start on their day of rides and roller coasters.

Another popular menu item will be the Orange Julius® premium fruit smoothies and fruit drinks.

“We are extremely excited about bringing the DQ Grill and Chill restaurant to Cedar Point,” said Jack Highsmith, Cedar Point’s vice president of accommodations and franchise food. “The DQ Grill & Chill concept has national recognition and a broad appeal to our guests. Plus, it will be able to provide a variety of menu options and ice cream treats all day long.”

Before opening, the building will be completely renovated to give the facility a fresh, new appearance. When completed, all of the seating areas, furnishings, rest rooms and food equipment will be replaced producing an interior that will be warm, welcoming and stylish. Outside, there will be new signage, landscaping, expanded drive-thru service and patio seating with decorative fencing.

When completed, the renovation project will cost approximately $1.5 million. A May opening is planned, however, an exact opening day has not been determined. After opening, the restaurant will be open daily through Labor Day Weekend, Sept. 3-5. It will also reopen for weekends through Oct. 29-30.

For additional information about the new DQ Grill & Chill location, please visit the park’s web site at www.cedarpoint.com or call Cedar Point’s General Information Line at 419.626.2350.

The 2011 Park Map (Spoilers)

Thanks to the help of my friend, Christopher Huges (@chriswc11), I stumbled upon the 2011 park map.  It’s not the full map as it takes up half a page in the school group brochure, but it gives you an idea of what the map and park will be like next year.

WindSeeker

Starting off at Cedar Point’s new ride WindSeeker we find the the Beach Entrance is going to be placed on an angle and it looks like WindSeeker’s queue line will start by the Extrema Sports Stadium as shown in the animation.

Chaos

We all knew it was coming, it looks like Chaos is leaving and a 3-point challenge is going in it’s spot.  As seen in the next image, it looks like the Demon Drop 3-point challenge has vanished from the map.

Ocean Motion

Cedar Point’s other “new” ride for 2011 is Ocean Motion.  Moving from it old location where WindSeeker is going to the Demon Drop’s old site.  A pond will be placed next to it to add to the theme of the ride.  As you can see the 3-point challenge is no longer shown.

Cedar Point’s carpenters busy all year long

From the Sandusky Register

SANDUSKY

Cedar Point in the winter can seem like an odd sight. Snow is on the ground, and it’s empty and quiet.

The picnic shelter near the park’s entrance is boarded up from view.

Inside the temporary makeshift shelter, equipped with heaters and work tables, the seeds of Cedar Point’s spring renewal are being sown.

Bellevue resident Jim Sumser, 38, one of two carpenter foremen working for Cedar Fair, is doing his part to make sure the park will be ready to open on May 14.

The various areas in the park seem to compile lists of what’s broken and what needs to be refurbished.

During the summer, the carpenters have to concentrate on keeping things running, so the winter shutdown lets them play catch up on other tasks.

“This is pretty much our main time to get those lists completed,” Sumser said.

As Sumser spoke, a brown wooden horse with a broken leg lay stretched across a table.

“The painters have taken all of the paint off with heat guns,” Sumser said. “Once we finish it, it will go back to the painters. This particular horse is from the Kiddieland Carousel.”

The carpenters are also responsible for other tasks: Fixing the wooden decks where passengers stand as they prepare to get on a roller coaster; putting up signs; building the walls that provide the maze for guests walking through the haunted houses during Halloweekends.

The workshop has big stacks of yellow pine boards.

“We use that for the ride decks, because it is a strong material and holds up well,” Sumser said.

Sumser grew up in Sandusky and still enjoys taking his wife and children to the park.

He said he especially enjoys how his work contributes to Cedar Point.

“It’s really nice to see that people are enjoying their vacations, because of something you were a part of, that you were able to make happen,” he said.

Much of the winter work takes place outside the warm cocoon of the temporary shelter.

In fact, about half the work takes place in the cold.

“We try to keep the guys out of the really nasty weather,” Sumser said. “A lot of times, there are projects that have to get done. That’s when we have to work outside.”

As the May 14 opening date nears, the carpenters will become even busier as everyone picks up the pace.

“About the month before we open, pretty much every department is on overtime,” he said. “We pretty much are running around like crazy, trying to make all of the last-minute fixes and changes.”

Once the park is open, the carpenters work day and night on three shifts.

One shift runs from 11 p.m. to 8 a.m. That way, any serious problem can be fixed promptly.

“If there’s a problem we can’t fix, it might reflect on how certain guests feel about this place,” Sumser said.

The park maintains 1,528 hotel rooms, including the rooms in Castaway Bay. Some of the issues in the hotels demand immediate action.

For example, when an electronic lock suddenly refuses to work, a carpenter is dispatched to fix it.

Usually, it simply needs power.

“We have to take the lock apart, put a new battery in,” Sumser said.

If that doesn’t fix it, the carpenter has to take the circuit board out.

Sumser doesn’t get called at home very often to deal with an emergency at work, but hotel problems can prompt such a call. A bad roof leak or a sprinkler system leak has to be fixed right away to prevent additional damage.

Sumser has been a union carpenter for 21 years. He’s a member of Carpenters Local 940, which negotiates contracts with the amusement park on behalf of the park’s carpenters.

“Recently, we just negotiated a five-year contract with Cedar Point,” he said.

Seeking the assurance of steady work and an interesting job, he went to work for Cedar Point after working in the construction business.

“It seemed pretty exciting to work in an amusement park, all of the roller coasters,” he said.

Cedar Point Off-Season (January 17, 2011)

Cedar Point - Off-Season Welcome Sign

For my first trip of the year, I had the opportunity to visit the park in the winter off-season. Mr. Innes was very nice and agreed to take myself and a few select CP Guide members on a tour of the main midway, wicked twister midway, and a small part of the wildcat midway.

Cedar Point - Off-Season Bay View

Cedar Point - Off-Season Toll Booths

To start we walked through the Hotel Breaker’s parking lot and saw the roller coaster cars awaiting a winter check-up.

Cedar Point - Coaster Cars

Cedar Point - Coaster Cars

Cedar Point - Coaster Cars

Cedar Point - Coaster Cars

Then we moved on to the WindSeeker construction site.  They had just poured the foundation the Friday before and they were working on setting up the concert mold for the ride base.

Cedar Point - WindSeeker Construction

Cedar Point - WindSeeker Construction

The concert they used was special concrete that need to be done in one pour, the reason behind the giant concert pour.  The foundation is 60ft by 60ft and the ride will go down 6ft.

Cedar Point - WindSeeker Construction

Cedar Point - WindSeeker Construction

Cedar Point - WindSeeker Construction

The ride is currently scheduled to open on opening day, but so was Shoot the Rapids, so we will have to see.

Cedar Point - WindSeeker Construction

Moving down the midway, we find Chaos, or the spot Chaos used to occupy.  Chaos is undergoing its off-season maintenance, but it doesn’t sound like it’s coming back.

Cedar Point - Off-Season Chaos Gone

Troika, like Chaos has been taken apart for its off-season maintenance, the rumor circulating is the Troika will go to Chaos’ spot and open up space for Disaster Transport to be replaced with a new coaster. Of course, this is just a rumor, and I don’t have any real facts to support it.

Cedar Point - Off-Season Troika

Cedar Point - Off-Season Troika

Throughout the park many rides have been shrink-wrapped; maXair is one of them as well as the test seat.

Cedar Point - Off-Season maXair

On the main midway, the games are all closed up as expected and Raptor was hibernating until May.

Cedar Point - Off-Season maXair Area

Cedar Point - Off-Season Johnny Rockets

Cedar Point - Off-Season Midway Games

Cedar Point - Off-Season Main Midway

Ocean Motion, on the other hand, will be getting a new home at the old Demon Drop location and it will be complemented with a pond when it opens in May. In the Blue Streak area, we find Calypso taken apart for its maintenance.

Cedar Point - Off-Season Calypso

Boo Hill has been reverted to its normal season look and the Blue Streak was nicely covered with snow.

Cedar Point - Off-Season Blue Streak

Cedar Point - Off-Season Blue Streak

Cedar Point - Off-Season Raptor

Moving onto the Wildcat Midway, we find that Dodgems has been enclosed so the floor doesn’t get ruined and Wildcat’s queue ramps have been taken apart for easy access to the track for car removal.

Cedar Point - Off-Season Corkscrew

Cedar Point - Off-Season Dodgems

Cedar Point - Off-Season Wildcat

Many of the fences around the park have also been removed for easier access to the rides.

Cedar Point - Off-Season Iron Dragon

The train cars for the CP and LE Railroad are at different parts of the track: one set back in Frontier Town and one is parked by the Mantis.

Cedar Point - Off-Season Train Cars

Moving on to Millennium Force, we find two cars left on the midway.  Of course we all went crazy taking pictures of it and the brand new wheels.

Cedar Point - Off-Season Millennium Force Car

Cedar Point - Off-Season Millennium Force Wheels

Cedar Point - Off-Season Millennium Force Wheels

Cedar Point - Off-Season Millennium Force

Cedar Point - Off-Season Millennium Force Car

Cedar Point - Off-Season Millennium Force Car

Cedar Point - Off-Season Millennium Force Wheels

Cedar Point - Off-Season Frontier Trail

Cedar Point - Off-Season Millennium Force

Ending the tour, we walked back down the Wildcat midway and by Scrambler and Matterhorn.

Cedar Point - Off-Season Skyride Station

Cedar Point - Off-Season Main Midway

Cedar Point - Off-Season Scrambler

Cedar Point - Off-Season Matterhorn

We passed Kinzel’s Castel and through the parking lot of coaster cars.

Cedar Point - Cedar Fair Corporate Offices

Cedar Point - Off-Season Power Tower

Cedar Point - Off-Season Top Thrill Dragster and Magnum XL-200

Cedar Point - Off-Season Hotel Breakers

On the way out I took some pictures of Mean Streak’s off-season track work and some views of the park from the road.

Cedar Point - Off-Season Challenge Racing

Cedar Point - Off-Season Mean Streak

Cedar Point - Off-Season Mean Streak

Cedar Point - Off-Season Blue Streak

Cedar Point - Off-Season Cadillac Cars

To finish the day I took a picture of me in front of the “Welcome to Cedar Point” sign.

Cedar Point - Off-Season Welcome Sign

Cedar Point - Off-Season Welcome Sign

Cedar Point - Off-Season Welcome Sign

As you might expect, those were only a small chuck of the pictures we took, click here to view all 150 pictures on flickr.

Cedar Point to Pour WindSeeker Foundation Tomorrow

Cedar Point Press Release

SANDUSKY, Ohio – Although there is ice on the lake and snow on the ground, the Cedar Point Beach will be a hub of activity tomorrow (Friday, Jan. 14) when the concrete foundation for its new ride, the 301-foot-tall WindSeeker swing ride, will be poured.

Weather permitting, more than 1,600 tons of concrete will be needed to build the 30-story ride’s foundation.  The dimensions of the foundation are 60 feet by 60 feet by 6 feet deep and will require more than 800 cubic yards of concrete.  Prior to the pour, more than 36 tons of steel rebar and 176 steel anchor bolts were placed in position.

Overall, the total weight of the foundation will be more than 3.3 million pounds or 1,650-plus tons of concrete and steel.

The Adena Corporation, Mansfield, will build the foundation while Huron Cement, Huron, will deliver the concrete.  The pour is scheduled to begin at approximately 7 a.m. and should be completed by 5 p.m.  A fleet of 14 trucks will make 80 continuous trips to the park to transport the concrete to the park.

To watch the construction progress, Cedar Point’s web site: cedarpoint.com will have two of its webcams covering all of the activities.  You can also follow the conversation about the construction via Cedar Point’s Facebook and Twitter pages.

Costing more than $5 million to build, WindSeeker will stand more than 30 stories above the Cedar Point Beach.  Seated in two-passenger swings with their feet dangling in the air, riders will be treated to breathtaking views of Cedar Point, Lake Erie and the Cedar Point Beach.

Cedar Point will open for the summer on Saturday, May 14.