Tag Archives: CP2011

New Paint on Millennium Force

Millennium Force Repainting 2011 (Coaster-net.com)
Picture Copyright Carsten Anderson of COASTER-net.com, used with permission.

After 11 years, Millennium Force is finally being repainted.  It currently looks like the lift and queue line area of track has been painted so far.  Hopefully the whole ride will be sporting a new coat of paint by Opening Day. I would like thank Carsten Anderson of COASTER-net.com who allowed us to use his pictures.

Millennium Force Repainting 2011 (Coaster-net.com)
Picture Copyright Carsten Anderson of COASTER-net.com, used with permission.

Marathon Petroleum Company LP to Sponsor New Nighttime Show at Cedar Point

Cedar Point Press Release

SANDUSKY, Ohio –  Marathon Petroleum Company LP (Marathon) will add even more dazzle to Cedar Point when it sponsors a spectacular new nighttime music and light show this summer at the Sandusky, Ohio, amusement park resort.

Called American Portrait, the new attraction will feature exciting music, high-def digitized video, advanced lighting system and an extensive display of colorful pyrotechnics that will illuminate the evening sky.

“American Portrait is dedicated to the Spirit of America,” said John Hildebrandt, vice president and general manager of Cedar Point.  “It will combine patriotic and contemporary music with unique images of American life.  The program will be fast-paced, uplifting and will be enjoyed by everyone in the family.”

The 15-minute program will be presented nightly beginning Friday, June 3 through Sunday, Aug. 21.  American Portrait will be shown on the park’s huge 3,600-square-foot projection screen located on the Iron Dragon Midway.  On most nights, American Portrait is scheduled to be shown at 10 p.m.

The park’s first nighttime sound and light show, The Summer Spectacular, began in 1995 as part of Cedar Point’s 125th anniversary celebration.

“We are proud to join Cedar Point in bringing this patriotic salute to the park,” said Tom Kelley, Marathon’s Senior Vice President Marketing.  “The brilliance and high energy of the new American Portrait nighttime show will be the perfect ending to a visit to Cedar Point.”

In addition to American Portrait, Cedar Point will also have a new show in the Jack Aldrich Theatre plus live music in two other theaters, an ice skating show featuring the PEANUTS characters, a thrilling stunt show with inline skaters and skateboarders and sing-a-longs with Snoopy and his friends.

Marathon is an integrated international energy company engaged in exploration and production; oil sands mining; integrated gas; and refining, marketing and transportation operations. Marathon, which is based in Houston, has principal operations in the United States, Angola, Canada, Equatorial Guinea, Indonesia, Iraqi Kurdistan Region, Libya, Norway, Poland and the United Kingdom. Marathon is the fourth largest United States-based integrated oil company and the nation’s fifth largest refiner.

For more information, please visit http://www.marathon.com or cedarpoint.com.

Cedar Point Off-Season (January 17, 2011)

Cedar Point - Off-Season Welcome Sign

For my first trip of the year, I had the opportunity to visit the park in the winter off-season. Mr. Innes was very nice and agreed to take myself and a few select CP Guide members on a tour of the main midway, wicked twister midway, and a small part of the wildcat midway.

Cedar Point - Off-Season Bay View

Cedar Point - Off-Season Toll Booths

To start we walked through the Hotel Breaker’s parking lot and saw the roller coaster cars awaiting a winter check-up.

Cedar Point - Coaster Cars

Cedar Point - Coaster Cars

Cedar Point - Coaster Cars

Cedar Point - Coaster Cars

Then we moved on to the WindSeeker construction site.  They had just poured the foundation the Friday before and they were working on setting up the concert mold for the ride base.

Cedar Point - WindSeeker Construction

Cedar Point - WindSeeker Construction

The concert they used was special concrete that need to be done in one pour, the reason behind the giant concert pour.  The foundation is 60ft by 60ft and the ride will go down 6ft.

Cedar Point - WindSeeker Construction

Cedar Point - WindSeeker Construction

Cedar Point - WindSeeker Construction

The ride is currently scheduled to open on opening day, but so was Shoot the Rapids, so we will have to see.

Cedar Point - WindSeeker Construction

Moving down the midway, we find Chaos, or the spot Chaos used to occupy.  Chaos is undergoing its off-season maintenance, but it doesn’t sound like it’s coming back.

Cedar Point - Off-Season Chaos Gone

Troika, like Chaos has been taken apart for its off-season maintenance, the rumor circulating is the Troika will go to Chaos’ spot and open up space for Disaster Transport to be replaced with a new coaster. Of course, this is just a rumor, and I don’t have any real facts to support it.

Cedar Point - Off-Season Troika

Cedar Point - Off-Season Troika

Throughout the park many rides have been shrink-wrapped; maXair is one of them as well as the test seat.

Cedar Point - Off-Season maXair

On the main midway, the games are all closed up as expected and Raptor was hibernating until May.

Cedar Point - Off-Season maXair Area

Cedar Point - Off-Season Johnny Rockets

Cedar Point - Off-Season Midway Games

Cedar Point - Off-Season Main Midway

Ocean Motion, on the other hand, will be getting a new home at the old Demon Drop location and it will be complemented with a pond when it opens in May. In the Blue Streak area, we find Calypso taken apart for its maintenance.

Cedar Point - Off-Season Calypso

Boo Hill has been reverted to its normal season look and the Blue Streak was nicely covered with snow.

Cedar Point - Off-Season Blue Streak

Cedar Point - Off-Season Blue Streak

Cedar Point - Off-Season Raptor

Moving onto the Wildcat Midway, we find that Dodgems has been enclosed so the floor doesn’t get ruined and Wildcat’s queue ramps have been taken apart for easy access to the track for car removal.

Cedar Point - Off-Season Corkscrew

Cedar Point - Off-Season Dodgems

Cedar Point - Off-Season Wildcat

Many of the fences around the park have also been removed for easier access to the rides.

Cedar Point - Off-Season Iron Dragon

The train cars for the CP and LE Railroad are at different parts of the track: one set back in Frontier Town and one is parked by the Mantis.

Cedar Point - Off-Season Train Cars

Moving on to Millennium Force, we find two cars left on the midway.  Of course we all went crazy taking pictures of it and the brand new wheels.

Cedar Point - Off-Season Millennium Force Car

Cedar Point - Off-Season Millennium Force Wheels

Cedar Point - Off-Season Millennium Force Wheels

Cedar Point - Off-Season Millennium Force

Cedar Point - Off-Season Millennium Force Car

Cedar Point - Off-Season Millennium Force Car

Cedar Point - Off-Season Millennium Force Wheels

Cedar Point - Off-Season Frontier Trail

Cedar Point - Off-Season Millennium Force

Ending the tour, we walked back down the Wildcat midway and by Scrambler and Matterhorn.

Cedar Point - Off-Season Skyride Station

Cedar Point - Off-Season Main Midway

Cedar Point - Off-Season Scrambler

Cedar Point - Off-Season Matterhorn

We passed Kinzel’s Castel and through the parking lot of coaster cars.

Cedar Point - Cedar Fair Corporate Offices

Cedar Point - Off-Season Power Tower

Cedar Point - Off-Season Top Thrill Dragster and Magnum XL-200

Cedar Point - Off-Season Hotel Breakers

On the way out I took some pictures of Mean Streak’s off-season track work and some views of the park from the road.

Cedar Point - Off-Season Challenge Racing

Cedar Point - Off-Season Mean Streak

Cedar Point - Off-Season Mean Streak

Cedar Point - Off-Season Blue Streak

Cedar Point - Off-Season Cadillac Cars

To finish the day I took a picture of me in front of the “Welcome to Cedar Point” sign.

Cedar Point - Off-Season Welcome Sign

Cedar Point - Off-Season Welcome Sign

Cedar Point - Off-Season Welcome Sign

As you might expect, those were only a small chuck of the pictures we took, click here to view all 150 pictures on flickr.

Cedar Point to Pour WindSeeker Foundation Tomorrow

Cedar Point Press Release

SANDUSKY, Ohio – Although there is ice on the lake and snow on the ground, the Cedar Point Beach will be a hub of activity tomorrow (Friday, Jan. 14) when the concrete foundation for its new ride, the 301-foot-tall WindSeeker swing ride, will be poured.

Weather permitting, more than 1,600 tons of concrete will be needed to build the 30-story ride’s foundation.  The dimensions of the foundation are 60 feet by 60 feet by 6 feet deep and will require more than 800 cubic yards of concrete.  Prior to the pour, more than 36 tons of steel rebar and 176 steel anchor bolts were placed in position.

Overall, the total weight of the foundation will be more than 3.3 million pounds or 1,650-plus tons of concrete and steel.

The Adena Corporation, Mansfield, will build the foundation while Huron Cement, Huron, will deliver the concrete.  The pour is scheduled to begin at approximately 7 a.m. and should be completed by 5 p.m.  A fleet of 14 trucks will make 80 continuous trips to the park to transport the concrete to the park.

To watch the construction progress, Cedar Point’s web site: cedarpoint.com will have two of its webcams covering all of the activities.  You can also follow the conversation about the construction via Cedar Point’s Facebook and Twitter pages.

Costing more than $5 million to build, WindSeeker will stand more than 30 stories above the Cedar Point Beach.  Seated in two-passenger swings with their feet dangling in the air, riders will be treated to breathtaking views of Cedar Point, Lake Erie and the Cedar Point Beach.

Cedar Point will open for the summer on Saturday, May 14.

Interview with Cedar Point Director of Maintenance & New Construction Ed Dangler

From WKZO.com

Coaster buffs like myself will enjoy a full 30 minutes with Ed Dangler, Director of Maintenance and New Construction at Cedar Point. Topics include various coaster wheel assembly arrangements, launch and restraint systems, how coasters and maintained and repaired, the process through which Cedar Point decides what to build and how to build it and much more!

Interview Highlights

  • No wooden coaster in the near future for Cedar Point, maybe after two more years. 16:12
  • Part of the WindSeeker’s foundation will be on the beach [like suggested by the construction stakes earlier this season].  18:10
  • WindSeeker Challenges  18:15
    • Winter Weather
    • Water Table
  • Process of Adding a Ride  20:32
    • Executive Planning Board to decide ride based on the need to offer guests something new and excited.
    • Ride manufacturing is in charge of the design.
      • TUV overseeing WindSeeker Construction.
  • Dick Kinzel decides if they want to be the first at something, such as the tallest and fastest roller coasters. 25:35
  • Nostalgia is a delicate decision at Cedar Point.  A long and thought out process to remove a ride. 26:00
  • Guest input is important. Cedar Point is good friends with ACEers.  They read and encourage comments.  Social media gives them instant feedback.  28:00